SAP PP QM Interview Questions
Conquer Your Next Interview: Essential SAP PP Questions and Answers
The SAP Production Planning (PP) module is a cornerstone for manufacturing businesses. Acing an interview for an SAP PP role requires a strong understanding of its functionalities. This blog post equips you with crucial SAP PP questions and answers to impress your interviewer.
SAP PP Fundamentals:
- Q: What is SAP PP?
- A: SAP PP helps manage all production activities, from planning and material procurement to execution and cost control.
- Q: Explain the Production Process in SAP PP.
- A: It involves:
- Production Planning: Defining what and when to produce (Master Production Schedule – MPS, Material Requirements Planning – MRP).
- Production Execution: Converting plans into action (Production Orders, shop floor control).
- Production Monitoring & Control: Tracking progress and identifying deviations (Shop Floor Control).
- A: It involves:
- Q: What are the different types of Production Planning in SAP PP?
- A: Common types include:
- Make-to-Stock (MTS): Produce for inventory based on forecast demand.
- Make-to-order (MTO): Production triggered by a specific sales order.
- A: Common types include:
Mastering Core Concepts:
- Q: What is a Bill of Material (BOM)?
- A: A BOM is a hierarchical list of components required to produce a finished product.
- Q: Explain the role of Routings in SAP PP.
- A: Routings define the sequence of operations needed to manufacture a product, including work centers, times, and tools.
- Q: What are Work Centers in SAP PP?
- A: Work centers represent physical locations or functional units where production activities occur (e.g., assembly line, machine).
Production Execution and Control:
- Q: Describe the steps in Production Order Execution.
- A: It typically involves:
- I am creating a Production Order from a planned order or sales order.
- We are releasing the Production Order for execution.
- They are issuing materials for production.
- Confirming production activities (goods produced, labor hours used).
- I am performing goods receipts for finished products.
- A: It typically involves:
- Q: What is the difference between TECO and CLSD for Production Orders?
- A: TECO (Technically Complete) indicates production is finished but not yet settled. CLSD (Closed) signifies the order is complete and settled financially.
Deep Dive into Specifics:
- Q: Explain MRP (Material Requirements Planning) functionality.
- A: MRP calculates the dependent demand for materials based on the production plan and BOM. It generates purchase requisitions to ensure timely material availability.
- Q: What are the different types of MRP evaluations in SAP PP?
- A: MRP evaluations analyze material requirements and identify potential issues like shortages or excess stock.
Beyond the Basics:
- Q: How does SAP PP integrate with other modules (e.g., MM, QM)?
- A: SAP PP interacts seamlessly with other modules, such as Material Management (MM) for procurement and Quality Management (QM) for inspections.
- Q: What are some best practices for optimizing production planning in SAP PP?
- A: Maintaining accurate master data (BOMs, routings), using MRP effectively, and real-time shop floor monitoring is crucial for efficient production.
Conclusion:
Unogeeks is the No.1 IT Training Institute for SAP PP Training. Anyone Disagree? Please drop in a comment
You can check out our other latest blogs on SAP PP here – SAP PP Blogs
You can check out our Best In Class SAP PP Details here – SAP PP Training
Follow & Connect with us:
———————————-
For Training inquiries:
Call/Whatsapp: +91 73960 33555
Mail us at: info@unogeeks.com
Our Website ➜ https://unogeeks.com
Follow us:
Instagram: https://www.instagram.com/unogeeks
Facebook:https://www.facebook.com/UnogeeksSoftwareTrainingInstitute
Twitter: https://twitter.com/unogeek