How to Create MRP Group in SAP PP
Creating MRP Groups in SAP PP for Optimized Material Planning
In SAP Production Planning (PP), MRP groups act as a classification tool for materials. They allow you to assign specific control parameters for Material Requirements Planning (MRP) to a group of materials, streamlining the planning process. This blog will guide you through creating MRP groups in SAP PP.
Why Use MRP Groups?
While you can define MRP parameters for individual materials in their master data, MRP groups become beneficial when dealing with many materials requiring similar planning strategies. Here’s how they can help:
- Standardization: Define standard planning parameters like strategy group, consumption mode, and planning horizon for a group of materials with similar characteristics.
- Efficiency: Assign MRP groups to materials instead of manually configuring individual settings, saving time and effort.
- Flexibility: Easily maintain and update planning parameters for an entire group, ensuring consistency across similar materials.
Creating an MRP Group in SAP PP
Here’s a step-by-step guide to creating MRP groups:
- Access SPRO: Log into SAP and navigate the SPRO customization menu.
- Navigate to MRP Group Definition: Use the path SPRO -> Production Planning (PP) -> Consumption-Based Planning -> Define MRP Group (OPPR).
- Define MRP Group Parameters: In the “Define MRP Group” screen, enter a unique MRP group code and a descriptive name. Here, you can also define various MRP control settings, including:
- Strategy Group: Assign a strategy group that determines the overall MRP planning strategy for the group (e.g., Make-to-Stock, Forecast-based Planning).
- Consumption Mode: Specify how the system determines material requirements (e.g., Forecast-based, Manual).
- Planning Horizon: Define the lead time for planning future material needs.
- Other MRP Control Settings: Based on your specific requirements, you can configure additional parameters like the lot-sizing procedure, safety stock calculation, and pegging settings.
- Save the MRP Group: Once you’ve defined the necessary parameters, save the MRP group using the appropriate function key.
Assigning MRP Groups to Materials
After creating MRP groups, you can assign them to materials in their master data. This is typically done through the Material Master (MM01, MM02) transaction, navigating to the MRP 1 view (MRP 1) or MRP 2 view (MRP 2), depending on your SAP version. In these views, locate the “MRP Group” field and assign the relevant group code you created earlier.
Benefits of Using MRP Groups
By effectively utilizing MRP groups, you can achieve:
- Simplified MRP Configuration: Manage planning parameters for a category of materials efficiently.
- Improved Planning Consistency: Ensure consistent planning strategies for similar materials.
- Reduced Maintenance Effort: Update planning settings for a group instead of individual materials.
Conclusion
MRP groups offer a valuable tool for optimizing material planning in SAP PP. By leveraging this functionality, you can streamline your planning processes, improve data consistency, and ultimately enhance production efficiency. For further details and specific configuration options, refer to SAP’s official documentation or consult with a qualified SAP consultant.
Conclusion:
Unogeeks is the No.1 IT Training Institute for SAP PP Training. Anyone Disagree? Please drop in a comment
You can check out our other latest blogs on SAP PP here – SAP PP Blogs
You can check out our Best In Class SAP PP Details here – SAP PP Training
Follow & Connect with us:
———————————-
For Training inquiries:
Call/Whatsapp: +91 73960 33555
Mail us at: info@unogeeks.com
Our Website ➜ https://unogeeks.com
Follow us:
Instagram: https://www.instagram.com/unogeeks
Facebook:https://www.facebook.com/UnogeeksSoftwareTrainingInstitute
Twitter: https://twitter.com/unogeek